PROFESSIONAL ESTIMATING FOR INDUSTRIAL CONSTRUCTION
Built by a 40-Year Industrial Estimator — for Estimators
Industrial Equipment
Setting Estimator
Watch a complete bid come together on a 1,500 MW power facility
2,103 line items · 30 plant areas · 5.7 million man-hours
THE ESTIMATE SHEET
Familiar spreadsheet look. Live totals. Every number derived from primitives.
1,583-item fully-labored equipment database across 27 major categories — every item editable, with bidirectional unit-rate and total calculation.
AREA NAVIGATOR
Thirty plant areas. One click to isolate any of them.
Tree navigation with sub-areas, drag ordering, and instant filtered views.
INSTANT SEARCH
2,103 line items searched as you type.
Live highlighting with click-to-navigate straight to the line.
CREW & TRADE RATES
Seven standard crews. Price each trade at its own rate.
Smart category-to-crew defaults with per-line overrides and colored crew badges.
PRODUCTIVITY FACTORS
Stack productivity adjustments the way AACE RP 25R-03 intends.
Project, area, category, and line-level factors with live net-impact indicators.
LABOR RATE BUILDUP
Composite wage rates built from base wage, burden, OT, and per diem.
Apply to the whole project or to selected lines in one step.
GENERAL CONDITIONS
Staff, consumables, insurance, bond — seeded from a real estimate sheet.
Pick-list of standard GC items plus unit, lump-sum, and flat-dollar entries.
SEVEN REPORTS
Every deliverable a bid package needs. One click each.
Section export, threshold filter, Gantt, manpower-loaded schedule, cash flow, bid recap, detailed takeoff.
BID RECAP
The full markup waterfall — direct cost to total bid price.
Burden, tax, field overhead, contingency, G&A, bond, and profit, each on its correct basis.
PROJECT SCHEDULE
An MH-weighted schedule straight from the estimate.
No re-entry. Bar widths driven by each area's share of total project manhours.
MANPOWER-LOADED SCHEDULE
Weekly headcount by area — peak crew visible at a glance.
156 weeks at 60 hours per week, distribution patterns auto-assigned by position.
CASH FLOW FORECAST
When the money goes out, when it comes back, and the peak draw between.
Configurable payment lag and retention, with billing and net cash position by month.
One file. No install.
No subscription. Works offline.
1,583
database items
27
equipment categories
7
reports
1
HTML file
Fully-labored, fully-editable estimating database · Excel and PDF export throughout
Runs inside most web browsers
[email protected]
1 / 14
PAUSED